Sea Barrier Project

Khanjan Land Reclamation Project and
Water Conservation Damming Project (Jal Shakti Abhiyan Project)

 

In one of the most exciting and challenging projects undertaken in the area, two complimentary projects are being undertaken by the community with funding, support and direction from the government to reclaim between 70 000 to 100 000 acres of salty marshland know as the Khanjan-kharland area including the Gurjer Baval wasteland as well as a water conservation project under PM Modiji’s initiative ‘Jal Shakti Abhiyan’ project to build a number of small concrete lined ponds (talavs) to harvest water during the moonsoon rain season and divert them to these ponds so that it can be reused during the dry season when water is scarce.

The main object of the land reclamation project is to build barriers to prevent sea water from entering the khanjan area during high tides and the monsoon season by using natural resources like sand and rock. This project will have many benefits and one of the most important is to prepare for climate change as sea levels begin to rise. Imagine the possibilities, potentially 100 000 acres of land converted into arable land that can be used for farming, housing and natural forests.

The ‘Jal Shakti Abhiyan’ Water Conservation project will focus on five aspects — water conservation and rainwater harvesting, renovation of traditional and other water bodies, reuse of water and recharging of structures, watershed development, and intensive afforestation – planting of trees.
This will be a multi-tear project involving many people in the community, and most important is requesting help from government agencies to help us in making it possible, this will involve the local, state and national governments.

Drainage and Irrigation pipelines will be installed to harvest the water during the raining season and irrigation pipelines will be used to supply water to householders and farmers during the dry season.

This will be a multi-year project involving everyone in the community, and most important is working with government officials and agencies to make it possible.

Next steps:

1. Organise a project leadership committee.
2. Project Planning – determine scope, benefits, costs and Timeline of the project
3. Engage government officials to be involved with all phases of the project
4. Engage the Community – Organise meetings with the community to discuss the scope and benefits of the project (community involvement and support)

 
 

ખાનજન લેન્ડ રીક્લેમેશન એન્ડ વોટર કન્ઝર્વેશન ડેમિંગ પ્રોજેક્ટ (જળ શક્તિ અભિયાન પ્રોજેક્ટ)

 

આ ક્ષેત્રે હાથ ધરવામાં આવેલા સૌથી આકર્ષક અને પડકારરૂપ પ્રોજેક્ટ્સમાં, સરકાર દ્વારા ભંડોળ, ટેકો અને દિશા સાથે 70 થી 100,000 એકર મીઠાના માટીના પ્રદેશમાં ફરી દાવો કરવા માટે સમુદાય દ્વારા બે પ્રશંસાત્મક પ્રોજેક્ટ હાથ ધરવામાં આવ્યા છે, જેમ કે ખાનજન-ખારલેન્ડ પી.એમ. મોદીજીની પહેલ ‘જલ શક્તિ અભિયાન’ યોજના હેઠળ ગુર્જર બાવલની વસાહત તેમજ પાણી સંરક્ષણ યોજના સહિતનો વિસ્તાર ચંદ્ર વરસાદની મોસમ દરમિયાન પાણીની લણણી કરવા માટે સંખ્યાબંધ નાના કોંક્રિટ રેખાંકિત તળાવો (તાલવ) બનાવવા અને તેમને આ તળાવમાં ફેરવવા માટે પ્રોજેક્ટ જ્યારે પાણી દુર્લભ હોય ત્યારે સૂકા મોસમમાં તેનો ફરીથી ઉપયોગ કરી શકાય છે.

જમીન સંપાદન યોજનાનો મુખ્ય હેતુ સમુદ્રના પાણીને ઊંચા ભરતી અને ચોમાસાની જેમ કુદરતી સાધનોનો ઉપયોગ કરીને ખંજન વિસ્તારમાં પ્રવેશતા રોકવા માટે અવરોધ ઊભો કરવાનો છે. આ પ્રોજેક્ટમાં ઘણાં ફાયદા હશે અને સૌથી મહત્ત્વનું એ છે કે આબોહવા પરિવર્તન માટે તૈયારી કરવી જોઈએ કારણ કે દરિયાઇ સ્તરમાં વધારો થવાનું શરૂ થાય છે. સંભવિત કલ્પનાઓની કલ્પના કરો, સંભવિત રૂપે 100,000 એકર જમીન ખેતીલાયક જમીનમાં રૂપાંતરિત છે જેનો ઉપયોગ ખેતી, આવાસ અને કુદરતી જંગલો માટે કરી શકાય છે.

‘જળ શક્તિ અભિયાન’ પાણી સંરક્ષણ યોજના પાંચ પાસાઓ પર ધ્યાન કેન્દ્રિત કરશે – પાણી સંરક્ષણ અને વરસાદી પાણીના સંગ્રહ, પરંપરાગત અને અન્ય જળાશયોનું નવીનીકરણ, પાણીનો પુન: ઉપયોગ અને માળખાના પુનઃચાર્જ, વોટરશેડ વિકાસ અને સઘન વનીકરણ – વૃક્ષો વાવેતર.
આ સમુદાયમાં ઘણાં લોકોને શામેલ એક મલ્ટિ-અશ્રુ પ્રોજેક્ટ હશે અને સૌથી મહત્વપૂર્ણ એ છે કે સરકારી એજન્સીઓ દ્વારા શક્ય બનવામાં સહાય કરવા માટે મદદની વિનંતી કરવામાં આવી રહી છે, આમાં સ્થાનિક, રાજ્ય અને રાષ્ટ્રીય સરકારો શામેલ હશે.

વરસાદની મોસમ દરમિયાન પાણીની ખેતી કરવા માટે ડ્રેનેજ અને ઇરિગેશન પાઇપલાઇન્સ ઇન્સ્ટોલ કરવામાં આવશે અને ડ્રાય સિઝન દરમિયાન ઘરના ખેડૂતો અને ખેડૂતોને પાણી પૂરું પાડવા માટે સિંચાઇ પાઇપલાઇનનો ઉપયોગ કરવામાં આવશે.

આ એક બહુ-વર્ષીય પ્રોજેક્ટ હશે જે સમુદાયમાં દરેકને શામેલ કરશે અને સૌથી મહત્વપૂર્ણ તે બનાવવા માટે સરકારી અધિકારીઓ અને એજન્સીઓ સાથે કાર્યરત છે.

આગામી પગલાં:

1. પ્રોજેક્ટ નેતૃત્વ સમિતિનું આયોજન કરો.
2. પ્રોજેક્ટ પ્લાનિંગ – પ્રોજેક્ટના સ્કોપ, લાભો, ખર્ચ અને સમયરેખા નક્કી કરો
3. સરકારી અધિકારીઓને પ્રોજેક્ટના તમામ તબક્કામાં સામેલ થવા માટે જોડાઓ
4. કમ્યુનિટિને જોડો – પ્રોજેક્ટના વિસ્તાર અને લાભો (સમુદાયની સંડોવણી અને સમર્થન) વિશે ચર્ચા કરવા સમુદાય સાથે મીટિંગ્સ ગોઠવો.


Urgent Action needed for protecting villages from rising sea levels because of Global Warming(Sea Barrier Conservation Project)

 


 

A. Introduction

An extensive portion of the land alongside the sea at Dandi and further south along the coastline in the Kantha Vibhag area has a problem of sea erosion and sea water overflowing into agricultural lands and over time this area has become unusable because of the saltiness of the land (know as Khanjar). This will continue to be a bigger problem because of rising oceans. Seasonal Monsoon flooding is another problem that has to be addressed, flooding in the villages during the rainy season disrupts life and it takes months to recover, proper draining and preparedness for the annual rains will alleviate the issue.

There is now an increasing need to protect the coastline and inner areas of our gams from sea water and erosion, especially because of rising waters due to global warming. Sea Water that has been flowing into the Khanjar areas over the years has been turning good arable farm land into unusable land caused by salty sea water and sea erosion. This can readily be reversed by erecting natural sea barriers where sea water overflows into the land in the form of sand and rock barriers and mangrove vegetation. Fish farmers who currently use sea water can continue doing so by piping sea water to the required pond areas.

Any solutions implemented should take into consideration monsoon rains together with the problems of drainage and runoff of much needed fresh water into the sea, it may be desirable to store this water perhaps in a lake. A feasibility study of all possible solutions should be presented before any project is started, this will all be done with the help and collaboration of the regional government departments.

As part of the Tree Planting Project, thousands of trees should be planted on the Dandi coastline as protection against natural calamities like cyclone, hurricane, Tsunami, etc.

B. Key Issues

– Severe sea erosion problems in some areas on the beachfront and further inland
– Sea levels rising every year due to climate change
– the solution of P.P. Gabions is not suitable
– Protection by using tetrapod mays be part of the solution, though high cost may be an issue
– If protection work is carried out by larger size stones, Gabions, Tetrapods, Beach will loose its
natural beauty
– a study needs to be conducted before a solution is implemented
– requires a permanent long term solution
– time is of the essence, if the government is unable to help with a timely solution then a community funded solution will be the only alternative.

C. Potential Solutions and Opportunities

The one solution is to put up barriers that will prevent sea water from overflowing into land areas, these barriers should be as high as the height of the highest watermark during high tide multiplied by two, this will ensure a permanent long term solution. Routine maintenance has to be planned on a periodic basis, perhaps quarterly to ensure that the barriers are not compromised due to soil erosion and wave action.

Land Reclamation – preventing sea water from overflowing into the area and reversing the saltiness of the Khanjar area will suddenly make hundreds of acres of land available for farming and other non-agricultural uses.

D. Challenges

1. Currently, sea water is used by the fishing industry in ponds, continuation of this supply is necessary by providing piping from the coastal area to the inland ponds on a limited basis.
2. Funding for the project
3. If nothing is done then there is a threat the entre Kantha Vibhag area may be overrun with sea water and it will result in loss of farmland and habitat.

E. Project Implementation

– All work that has to be done should be conducted with the help and permission of the relevant government authorities.
– A detailed project plan and timeline should be established
– Proper project management and controls to be in place


National Jal Shakti Abhiyan Project